After six months of waiting for all permits, the demolition of the illegal constructions is finally happening.
The timing could not have been worse though, because in this very same week we have Miquel from Spain working on the land. We hired him and a special tool of him to prepare the land for reforesting. Not a good moment for also having heavy tools and trucks moving around.
Or actually, the timing could have been MUCH worse: if the demolition came AFTER Miquel was finished.